Premium Cleaning Services

Construction Cleanup cleaning in Edmonton

Three-phase post-construction cleanup for Edmonton builders, GCs, and homeowners — debris-out, detail clean, and pre-handover touch-up.

Overview

What this service covers, and who it's for.

Construction dust gets everywhere — into HVAC, behind cabinets, into the threads of fixtures. Our post-construction division handles all three industry-standard phases. Rough clean clears the site of large debris and sweeps it down for trades. Final clean is the detail pass: every surface, fixture, window, and floor. Touch-up clean happens 24 hours before handover to deal with any dust that has resettled and any marks left by punch-list work. We work with custom home builders in Windermere and Cameron Heights, multi-family GCs across the city, and commercial fit-outs in the downtown core. Crews are PPE-compliant and briefed on your site safety plan before access.

Scope of work

Every visit, in writing.

The list below is the documented checklist crews follow on a construction cleanup contract. Your final scope is confirmed during the on-site walk-through and signed off after every visit.

Phase 1 — Rough clean

  • Debris haul-out and disposal coordination
  • Sweep and vacuum of all surfaces
  • Sticker and tape removal from windows and fixtures
  • Sub-floor prep ahead of finish flooring install

Phase 2 — Final clean

  • Wet-wipe of every surface, including inside cabinets and drawers
  • Fixture, hardware, and appliance polish (interior and exterior)
  • Window cleaning inside and out (ground floor) with track and frame detail
  • Floor finishing: vacuum, mop, or polish per material
  • HVAC vent and register vacuum

Phase 3 — Touch-up clean

  • Re-dust of all horizontal surfaces 24 hours before handover
  • Re-polish of glass and stainless
  • Fingerprint and scuff removal from doors and trim
  • Walk-through with site super to clear punch-list
Construction Cleanup cleaning in Edmonton
Credentials
  • $5M general liability
  • WCB clearance on file
  • Background-checked, bonded crews
Engagement options

Three ways we typically engage.

Most construction cleanup clients fall into one of these three structures. Final pricing is quoted after the walk-through.

01

Single-phase clean

Most often final-only, when a builder has handled rough-in. Quoted by square footage and finish complexity.

02

Three-phase package

Rough + final + touch-up scheduled to your construction calendar. Discounted versus booking phases separately.

03

Multi-unit / production builder

Standing-order pricing for builders running multiple completions per month. Dedicated lead and standardized checklist per unit type.

Equipment & chemistry

The right tools, matched to the surface.

HEPA-filtered vacuums (mandatory for drywall dust), backpack vacs for hard-to-reach areas, scissor lifts for high windows and fixtures, magic erasers and razor blades for paint and adhesive overspray, and pH-neutral solutions safe for newly sealed floors and stone.

Frequently asked

Questions, answered.

Ready to scope your construction cleanup contract?

Tell us about the space. We will reply within one business day with a scoped estimate — no hard sell.

Call Now